Now you see it (patched up).
Now you don't!
Where oh where did it go???
I don't know.
The plasterer came. 
He covered the floor with tarps everywhere. 
Little flakes of plaster still got under them. 
I swept, but still have to mop. *pfft*
But I have this. 
And this. 
To look at. 
*sigh*
It looks so much better.
In 5-6 days, I get to paint! Holla!
P.S. While he was inside performing miracles, I was working on the bike wiring. Got it all crimped together and taped up and tested it.
They don't work. 
Yet.
 




 
2 comments:
Yay! on the patched hole. Boo! on the none working lights. Hope the painting goes well and you get the lights figured out soon. :)
Thanks, lights still not working, but I have an idea yet! :)
It's strange how much difference a ceiling can make!
Post a Comment